Search

Leave a Message

Thank you for your message. We will be in touch with you shortly.

Explore Our Properties
Background Image

Story Mill Park Got Its Splash Pad. The Neighborhood Around It Finally Showed Up Too.

September 24, 2026

On a Saturday morning in September, Story Mill Community Park runs on three separate clocks. Dogs cut loose in the West Paw Dog Park while their owners drink coffee. Kids chase spray through the cattail-shaped nozzles of the new splash pad. A few beds over in the community garden, someone is on their knees pulling the last of the season's kale, part of a plot system built specifically around food sovereignty and shared growing knowledge. None of this required a car. All of it required North Bozeman to spend the better part of a decade catching up to a plan it made a long time ago.

That is the part of this story that gets lost when people talk about the splash pad like it's just a new toy. It isn't new so much as overdue, and it isn't the only overdue thing that finally landed this year.

A Park That Took Seven Years to Finish a Sentence

Story Mill Community Park opened to the public on July 20, 2019, the product of a 2012 open space bond and a partnership between the City of Bozeman and the Trust for Public Land. The 60 acres split into two distinct halves from day one: a developed northern section with the adventure playground, picnic pavilions, an amphitheater, and the community garden, and a southern half left as a nature sanctuary, its restored wetlands and East Gallatin River frontage open to foot traffic on trails and boardwalks but closed to dogs.

The splash pad was part of that original master plan. It just wasn't part of the 2019 build. It sat as a line item in the vision for years, the kind of amenity that shows up in renderings long before anyone breaks ground on it, until this summer, when the City finally opened it on June 26, 2026, as Bozeman's first public splash pad. The design leans into the same wetland language as the rest of the park: spraying cattails and reeds, rock and log features, nothing that looks bolted onto a nature preserve. It runs daily from 11 a.m. to 8 p.m., it's free, and the City has been clear about the terms: no lifeguard on duty, no reservations for parties or private events, adults responsible for their own kids. That's a meaningfully different amenity than a fenced municipal pool, and it's worth knowing before you show up expecting either.

The other piece that closed this gap was quieter. The park's east parking lot, off Bridger Drive, opened in fall 2025, a full year before the splash pad, but it's the reason the splash pad works logistically at all. A park that had been running on a single access point for six years now has two, right as the amenity most likely to draw a crowd went in.

Half a Mile Down Wallace, a Different Kind of Unfinished Business

Walk or bike south from the park along Wallace Avenue and you'll hit a construction site that has been unfinished for closer to twenty years than seven. The corner of Wallace and Tamarack was once home to a brewery built by the Lehrkind family in 1895, a building large enough that it held the record as Bozeman's biggest structure until Montana State University built its fieldhouse. A developer bought the site in 2007 and tore most of it down. The recession stalled whatever came next, and one wall of the old brewery stood alone on the lot until 2014.

What's rising there now is Wallace Works, a mixed-use project from Nest Partners, the same development team behind the Lark Motel and the restoration of the Rialto. The plan calls for row homes for sale, rental apartments, live-work units, and street-level commercial space including a restaurant or cafe, built to sit inside the historic Northeast Historic Mixed-Use district rather than erase it. When the project was first proposed, developer Erik Nelson told the Bozeman Daily Chronicle they wanted to keep the "funkiness and grit" of the neighborhood, not smooth it into something else. Construction is underway now. The commercial tenants aren't open yet, but the framing is up, and it's the kind of site you drive past differently once you know what it used to be and how long it sat empty.

It's not the only project turning that history over. The Human Resources Development Council has plans to build affordable housing on eight acres next to the park itself, and Hidden Creek Community, a separate project elsewhere in Bozeman, broke ground on May 1, 2026, bringing 182 units of workforce housing online this year. None of that is specific to Story Mill's blocks, but it tells you the pattern isn't isolated. Northeast Bozeman spent a long stretch as the part of town people described as rough. What's replaced that description over the past decade is a corridor of artists, coffee shops, and breweries filling in old industrial buildings one lot at a time, and Wallace Works is the biggest single piece of that still under construction.

The Corridor Just Picked Up a National Nod, Too

A few blocks over, at the corner of Peach Street and Wallace, Wild Crumb has been baking out of the same building for years. In June 2026, at the James Beard Foundation's Restaurant and Chef Awards in Chicago, Wild Crumb won Outstanding Bakery. That's not a hyperlocal footnote. It's a national jury putting a spotlight on a business inside the same half-mile stretch that just finished a splash pad and is finishing a two-decade-old brewery redevelopment. Three separate signals, three separate timelines, landing in the same small piece of the map within about twelve months of each other.

A Saturday, As It Actually Runs Now

If you live near the park and want to see what's changed, the loop looks something like this:

  • Morning at the West Paw Dog Park or a lap of the wetland boardwalks in the nature sanctuary, where the trail network hasn't changed but the crowd has grown since the east lot opened.
  • Midday at the splash pad if you've got kids, timed around the no-lifeguard rule so someone's actually watching.
  • A stop at the community garden if you keep a plot, or just a walk past it if you don't.
  • A ride down Wallace Avenue past the Wallace Works construction fence, watching a twenty-year gap in the streetscape finally get filled in.
  • A finish at Wild Crumb, where a James Beard sticker in the window means something different now than it did a year ago.

None of that loop existed in this shape as recently as 2024. The park was there, but it ended at the wetlands with nowhere obvious to walk next. The brewery lot was a fenced hole. The bakery was just a very good bakery.

Two Timelines, One Fall

The easy version of this story is that Story Mill Park got a nice new feature for kids. The more accurate version is that a park finished seven years late and a construction site finished two decades late both crossed their finish lines inside the same twelve-month window, and a national food award landed in the middle of it almost by coincidence. Nobody planned for the splash pad and Wallace Works to open in the same stretch of calendar. But because they did, this pocket of North Bozeman stopped being a park with a neighborhood nearby and started being one continuous place, walkable end to end, for the first time since anyone drew up the plans.

If you're already living near Bridger Drive, that's probably the thing you've noticed without quite naming it: the walk feels different this year, even though the map hasn't changed at all.

If you're weighing whether this part of Bozeman fits what you're looking for, or you want a closer read on how a neighborhood's daily rhythm holds up against what the listings show, Mikey Duquette and the Bert & Mikey team know these blocks well enough to walk you through them in person. Reach out to start the conversation or request a free home valuation.

Follow Us On Instagram